A typical install takes 2 to 3 working days, spread across about a week so the concrete can set. Most of the calendar time comes earlier, in the steps that lead up to the first hole.

How long does it take to put up a fence?

StepWhat happens
1. EstimateSite visit, measurements, written quote
2. ApprovalsPermit, HOA or historic review where they apply
3. Dig SafeNotice goes in 72 hours ahead. Weekends and legal holidays are not counted
4. PostsHoles dug, posts set, concrete left to harden
5. FenceRails, panels and gates go on, then clean-up

What causes delays around Boston?

Season is the biggest factor. Demand peaks from spring into early summer, and the ground can freeze hard in midwinter. Paperwork is next, above all a review in a historic district. On site, rock, tree roots and leftover concrete from an earlier fence slow the digging. Custom gates and materials that must be ordered add waiting time too.

A new dog in three weeks and no fence yet. What can be done in time?

  • Book the estimate today. The permit check and the Dig Safe notice eat into those weeks.
  • Pick stock material. Chain link and standard wood panels are quickest to get.
  • Have a fallback: enclose a smaller dog run first and finish the remaining yard afterward.

With a pool going in, do we build the fence before or after?

Mostly after the dig, but plan both at once. Excavators need a gap to drive through, so that stretch of fence waits until the machines are gone. The remaining sides can often go up earlier. The pool does not get its final approval until the full barrier is up and has been inspected.

The HOA wants the fallen panels fixed by Monday and my contractor is late. Is a handyman patch acceptable?

On a fence you own, a short-term patch is your decision, and boards tend to accept it as meeting a deadline. Check the contract you signed before anyone touches the fence. Email the contractor to say a temporary repair is being made, by whom and for what reason. That keeps later questions about workmanship clean.

Want a price for your own yard? The estimate is free, done on site, and the quote comes in writing. Call (508) 690-4738.

Reviews

Selected 5-star Google reviews

★★★★★
The fence team arrived on time, worked efficiently, and cleaned up afterward.
Ivan A. · Google review

More services

Areas we serve

Ready to get started?

Free estimate and a written quote. Call us or send the form.

Call (508) 690-4738